This retrofit project was for a landmark building in the Times Square area. The 6,000,000 BTUH boiler plant provides heat for this electric to hydronic system conversion. Sidewall venting required due to lack of chimney in building. Boiler controls communicate with Johnson Controls BMS to vary HWS reset temperatures from 180 to 100 degrees to provide optimum heating system control and maximum efficiency.